Project Status

Competition 2007

Client

Urban Splash

Structural Engineer

Webb Yates Engineers

In response to the the tight budget and the various access requirements imposed by the brief we proposed a simple cor-ten steel fabrication with three points of contact. The bridge fabrication is limited to one thickness of steel permitting all elements to be cut from large plates with minimum wastage. The structural zone remains constant but intensifies towards the middle where loads are greater resulting in a dynamic and graceful form describing the forces at play.